SEC. 91.8805. GENERAL REQUIREMENTS.
Los Angeles Building Code — LAMC Chapter IX · 2026-08 edition · updated 2026-09-09 · Los Angeles
(Amended by Ord. No. 171,939, Eff. 4/15/98.)
The owner of each building within the scope of this division shall cause a structural analysis to be made of the building by a civil or structural engineer or architect licensed by the state of California, and if the building does not meet the minimum earthquake standards specified in this division, the owner shall cause it to be structurally altered to conform to such standards or cause the building to be demolished.
The owner of a building within the scope of this division shall comply with the requirements set forth above by submitting to the Department for review within the stated time limits:
Within 270 days after the service of the order, a structural analysis. Such analysis, which is subject to approval by the Department, shall demonstrate that the building meets the minimum requirements of this division, or
Within 270 days after the service of the order, the structural analysis and plans for the proposed structural alterations of the building necessary to comply with the minimum requirements of this division, or
Within 120 days after service of the order, plans for the installation of wall anchors in accordance with the requirements specified in Section 91.8808.3, or
Within 270 days after the service of the order, plans for the demolition of the building.
After plans are submitted and approved by the Department, the owner shall obtain a building permit, and commence and complete the required construction or demolition within the time limits set forth in Table No. 88-B. These time limits shall begin to run from the date the order is served in accordance with Sections 91.8806.1 and 91.8806.2.
Owners electing to comply with Item 3 are also required to comply with Items 2 and 4, provided, however, that the 270 day period provided for in Items 2 and 4 and the time limits for obtaining a building permit, commencing construction and completing construction for complete structural alterations or building demolition set forth in Table No. 88-B shall be extended in accordance with Table No. 88-C. Each such extended time limit, except the time limit for commencing construction, shall begin to run from the date the order is served in accordance with Section 91.8806.2. The time limit for commencing construction shall commence to run from the date the building permit is issued.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Los Angeles Building Code — LAMC Chapter IX
- Chapter IX
- Chapter IX — BUILDING REGULATIONS
- Division 1
- Division 2
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 8
- Division 9
- Division 10
- Division 11
- Division 12
- Division 13
- Division 14
- Division 15
- Division 16
- Division 17
- Division 18
- Division 19
- Division 20
- Division 21
- Division 22
- Division 23
- Division 24
- Division 25
- Division 26
- Division 27
- Division 28
- Division 29
- Division 30
- Division 31
- Division 32
- Division 33
- Division 34
- Division 35
- Division 61
- Division 62
- Division 63
- Division 67
- Division 70
- Division 71
- Division 72
- Division 82
- Division 83
- Division 85
▸Division 88
Overview- SEC. 91.8802. SCOPE.
- SEC. 91.8803. DEFINITIONS.
- SEC. 91.8805. GENERAL REQUIREMENTS.
- SEC. 91.8806. ADMINISTRATION.
- SEC. 91.8807. HISTORICAL BUILDINGS.
- SEC. 91.8808. ANALYSIS AND DESIGN.
- SEC. 91.8809. MATERIALS OF CONSTRUCTION.
- SEC. 91.8811. DESIGN CHECK – COMPATIBILITY OF ROOF DIAPHRAGM S…
- SEC. 91.8812. VIOLATIONS.
- SEC. 91.8813. SPECIAL REQUIREMENTS FOR VACANT BUILDINGS.
- Division 89
- Division 90
- Division 91
- Division 92
- Division 93
- Division 94
- Division 95
- Division 96
- Division 5 — REGISTRATION
- Division 16A
- Division 17
- Division 18
- Division 19
- Division 20
- Division 21
- Division 17
- Division 18
- Division C
- Division D