Earlier editions: 2026-07
Half Moon Bay Municipal Code Ch. 13.36 Sewer Permits
Half Moon Bay Municipal Code · 2026-10 edition · updated 2026-10-04 · Half Moon Bay
Cite as: Half Moon Bay Municipal Code Chapter 13.36 · Text as of 2026-10-04
§ 13.36.010. Permit required.¶
No unauthorized person shall uncover, make any connection with or opening into, use, alter or disturb any public sewer or appurtenances or perform any work on any lateral or building sewer without first obtaining a permit from the city. A request for a permit shall be submitted on a form provided by the city and is subject to fee set by the city council. Upon issuance of permit, no change shall be made in the location of the sewer, the grade, materials or other details from those described in the permit or as shown on the plans and specifications for which the permit was issued, without written approval of the city engineer.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.020. Agreement to comply.¶
The applicant's signature on an application for any permit shall constitute an agreement to comply with all of the provisions, terms and requirements of Chapters 13.12 through 13.40 and other ordinances, rules and regulations of the city, and with the plans and specifications he has filed with his application, if any, together with such corrections or modifications as may be made or permitted by the city, if any. Such agreement shall be binding upon the applicant and may be altered only by the city upon the written request for the alteration from the applicant.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.030. Inspection of work.¶
All sewer construction work including private laterals, private mains, sewer connections and sewer mains shall be inspected by the city to ensure compliance with the permit and all applicable requirements of the city. No sewer shall be covered at any point until it has been inspected and passed for acceptance. No sewer shall be connected to the city's public sewer until the work covered by the permit has been completed, inspected and approved by the city inspector. If the test proves satisfactory and the sewer has been cleaned of all debris accumulated from construction operations, the inspector shall issue a certificate of satisfactory completion. The city reserves the right to require video inspection of any permit work.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.040. Notification for inspection.¶
It shall be the duty of the person doing the work authorized by permit to request inspections at the appropriate time when work is ready for inspection. Such notification shall be given not less than one business day prior to the inspection. It shall be the duty of the person doing the work to ensure that the work complies with the permit and city standards prior to requesting an inspection.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.050. Correction notice.¶
Upon completion of an inspection and determination that the work is unsatisfactory, the inspector provides a written correction notice indicating the reasons for failed inspection.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.060. Costs to be paid by owner.¶
All costs and expenses incident to the installation and connection of any sewer or other work for which a permit has been issued shall be borne by the owner. The owner shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the work.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.070. Connection of parcel outside city limits.¶
Extension of sewer service to a parcel located outside of the city limits is subject to the approval of an outside city sewer service area agreement by the city council. The owner shall be responsible for all costs associated with approval of agreement, connection fees, construction costs and service charges. It shall be the responsibility of the owner to obtain approvals and permits from San Mateo County.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.080. Outside sewer permit–Optional.¶
The granting of such permission for an outside sewer in any event shall be optional with the city council.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.090. Special contract for outside sewers.¶
Where special conditions exist relating to an outside sewer, they shall be the subject of a special contract between the applicant and the city council.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.100. Encroachment permit required.¶
A separate encroachment permit must be secured from the county or city for any work proposed within the public right-of-way.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
§ 13.36.110. Time limit on permits.¶
If work under a permit is not commenced within six months from the date of issuance or if, after partial completion, the work is discontinued for a period of one year, the permit shall thereupon become void and no further work shall be done until a new permit shall have been secured. A new fee shall be paid upon the issuance of a new permit or substantially modified permit.
(Ord. C-2020-04 § 2(Att. A)(part), 2020)
Get a plain-English answer with a citation back to this text.
Ask AI about this code