Earlier editions: 2026-09
Title 13 — Public Works
Gardena Municipal Code · 2026-10 edition · updated 2026-10-04 · Gardena
In this part
- Chapter 13.04 — SEWER SYSTEM
- Chapter 13.08 — INDUSTRIAL WASTES – DISCHARGES TO PUBLIC SEWERS
- Chapter 13.12 — INDUSTRIAL WASTES – DISCHARGES TO OTHER THAN PUBLIC SEWERS
- Chapter 13.16 — INDUSTRIAL WASTE PERMITS
- Chapter 13.20 — INDUSTRIAL WASTE TREATMENT PLANTS AND FACILITIES
- Chapter 13.24 — SEWER CONNECTION CHARGES
- Chapter 13.26 — SEWER USE FEE
- Chapter 13.28 — MOVING OVERSIZED LOADS
- Chapter 13.32 — PIPELINE FRANCHISES
- Chapter 13.36 — PUBLIC PROJECT CONTRACTS
- Chapter 13.40 — STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
- Chapter 13.44 — STREET DESIGN REQUIREMENTS
- Chapter 13.48 — REQUIRED DEDICATIONS AND IMPROVEMENTS
- Chapter 13.52 — STREET VACATIONS
- Article I — General Provisions And Definitions
- Article II — Application For And Issuance Of Permits
- Article III — Encroachment Permits – General Requirements
- Article IV — Encroachment Permits – Construction Activity
- Article V — Encroachment Permits – Excavations And Encroachments
- Chapter 13.60 — TREES, SHRUBS AND PLANTS
- Chapter 13.64 — UNDERGROUND UTILITY DISTRICTS
Get a plain-English answer with a citation back to this text.
Ask AI about this code