Streamlined Ministerial Approval Process (SMAP) Determination Methodology and… ¶
SMAP Reporting Period ¶
SB 423 (Chapter 778, Statutes of 2023) defines the Reporting Period, for all jurisdictions except for the City and County of San Francisco, as the first half of the regional housing needs assessment (RHNA) cycle or the complete RHNA cycle. SB 423 changed the SMAP Determination for the City and County of San Francisco to be calculated annually, rather than at the mid-point or end of cycle.
Once a jurisdiction completes the first half of the 5th RHNA cycle, its next determination update will occur at the end of the 5th RHNA cycle. Thereafter, each jurisdiction’s determination is updated at the completion of the first half of the 6th RHNA cycle and again at the end of the 6th RHNA cycle. Subsequent RHNA progress evaluations will occur at the mid-point of the 7th RHNA cycle and again at the end of the 7th RHNA cycle. Please see the pages below for specific dates for each region’s determinations.
1
Contents ¶
Association of Monterey Bay Area Governments (AMBAG) and San Benito County Council of Governments (San Benito COG) – includes Monterey, Santa Cruz, and San Benito Counties, and all cities within each county ........................................................................... 4 Fresno Council of Governments (FCOG) and Kern Council of Governments (KCOG) – includes Fresno and Kern Counties; and all cities within each county ............................................. 5 Stanislaus County Council of Governments (Stan COG) and Tulare County Association of Governments (TCAG) – includes Stanislaus and Tulare Counties; and all cities within each county ..................................................................................................................................... 6 San Joaquin County Council of Governments (SJCOG) – includes San Joaquin County; and all cities within the County ........................................................................................................ 7 Kings County Association of Governments (KCAG) and Madera County Transportation Commission (MCTC) – includes Kings and Madera; and all cities within each county ................... 8 Merced County Association of Governments (MCAG) – includes Merced County; and all cities within the County.................................................................................................................... 9 City and County of San Francisco ................................................................................................... 10 Association of Bay Area Governments (ABAG), includes Alameda, Contra Costa, Marin, Napa, San Mateo, Santa Clara, Solano, and Sonoma Counties; and all cities within each county ........................................................................................................................... 12 Santa Barbara County Association of Governments (SBCAG) – includes Santa Barbara County; and all cities within the County ........................................................................................... 13 Southern California Association of Governments (SCAG) – includes Imperial, Los Angeles, Orange, Riverside, San Bernardino, and Ventura Counties; and all cities within each county ........................................................................................................................... 14 Sacramento Area Council of Governments (SACOG) – includes El Dorado, Placer, Sacramento, Sutter, Yolo, and Yuba Counties; and all cities within each county ............................ 15 Tahoe Regional Planning Agency (TRPA) – includes the City of South Lake Tahoe ........................ 16 Butte County Association of Governments (BCAG) – includes Butte County; and all cities within the County.................................................................................................................... 17 County of San Diego; and all cities within the County ....................................................................... 18 County of Inyo; and all cities within the County ............................................................................... 19 Counties of Del Norte and Siskiyou; and all cities within each county ............................................. 20 Counties of Alpine, Lassen, Mariposa, Modoc, Plumas, Sierra, Tehama, Trinity, and Tuolumne; and all cities within each county .................................................................................... 21 County of Calaveras; and all cities within the county ....................................................................... 22 County of Humboldt; and all cities within the county........................................................................ 23 Counties of Lake, Mendocino, Mono, and Nevada; and all cities within the county ......................... 24 County of Shasta; and all cities within the county ............................................................................ 25 Counties of San Luis Obispo and Colusa; and all cities within each county .................................... 26 County of Glenn; and all cities within the county ............................................................................. 27 County of Amador; and all cities within the county .......................................................................... 28
...................... 25 Counties of San Luis Obispo and Colusa; and all cities within each county .................................... 26 County of Glenn; and all cities within the county ............................................................................. 27 County of Amador; and all cities within the county .......................................................................... 28
2
Introduction ¶
SB 423 (Wiener, 2023), updated SB 35 (Wiener, 2017), and made changes to how SMAP Determination criteria are applied:
- Any jurisdiction in the 6th Housing Element Planning Cycle without a compliant Housing Element is now required to apply SMAP Streamlining for housing developments with 10% affordability. Any jurisdiction in the 7[th ] Housing Element Planning Cycle without a compliant Housing Element before the 7[th ] cycle Housing Element deadline is now required to apply SMAP Streamlining for housing developments with 10% affordability.
- Upon reaching Housing Element compliance, the jurisdiction reverts to the current SMAP Determination criteria (i.e., progress towards the regional housing needs allocation (RHNA)).
- SB 423 also changed the SMAP Determination for the City and County of San Francisco to be calculated annually, rather than at the mid-point or end of cycle.
A developer may submit an SB 330 preliminary application in partnership with SMAP applications to lock in the current SMAP Determination regardless of future changes to Housing Element compliance or subsequent SMAP Determination.
A developer can confirm the jurisdiction’s current compliance status using the SMAP Dashboard.
Annual Progress Reports (APRs) are on calendar years, while RHNA planning periods[1] may begin and end at various times throughout the year. When the planning period begins after July, the APR for that year is attributed to the prior RHNA cycle. When the planning period ends before July 1, the APR for that year will be attributed to the following RHNA cycle.
More detail is shown below by regional government or county and applies to all jurisdictions within the regional government or county.
Credit for Permitting during Projection Period ¶
Jurisdictions may count permits that occurred during the 5th cycle projection period[2] before the planning period began on the first APR of the 5th cycle planning period.
APR Due Dates ¶
APRs are due each April and report on the prior calendar year’s activities. As of April 1, 2026, the 2025 APRs and prior APRs were due. While HCD will continue to update APR data as APRs are received, permits from APRs received after June 1, 2026, will not count toward this determination of a jurisdiction’s eligibility for SMAP. The determination includes APRs received as of June 2, 20265.
1 Planning Period: The time period between the due date for one Housing Element and the due date for the next Housing Element. This time period can be either 8 or 5 years, depending on the jurisdiction. When the planning period begins after July 1, the APR for that year is attributed to the prior cycle.
2 Projection Period: The time period for which the RHNA is calculated.
3
Association of Monterey Bay Area Governments (AMBAG) and San Benito County Council of Governments (San Benito COG) – includes Monterey, Santa Cruz, and San Benito Counties, and all cities within each county
Planning and Projection Periods ¶
5th Cycle Planning Period: 12/15/2015 – 12/15/2023
5th Cycle Projection Period: 01/01/2014 – 12/31/2023
5th Cycle Planning Period Halfway Point: December 2020
| APRs that count toward the First Half of the Reporting Period |
2016 2017 2018 2019 |
|---|---|
| APRs that count toward the Last Half of the Reporting Period |
2020 2021 2022 2023 |
SMAP Eligibility Methodology ¶
| After 2019 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2023 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
4
Fresno Council of Governments (FCOG) and Kern Council of Governments (KCOG) – includes… ¶
Planning and Projection Periods ¶
5th Cycle Planning Period: 12/31/2015 – 12/31/2023
5th Cycle Projection Period: 01/01/2013 – 12/31/2023
5th Cycle Planning Period Halfway Point: December 2020
| 5th Cycle Planning Period Halfway | Point: De |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2016 2017 2018 2019 |
| APRs that count toward the Last Half of the Reporting Period |
2020 2021 2022 2023 |
SMAP Eligibility Methodology ¶
| After 2019 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2023 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
5
Stanislaus County Council of Governments (Stan COG) and Tulare County Association of Governments (TCAG) – includes Stanislaus and Tulare Counties; and all cities within each county
Planning and Projection Periods ¶
5th Cycle Planning Period: 12/31/2015 – 12/31/2023
5th Cycle Projection Period: 01/01/2013 – 12/31/2023
5th Cycle Planning Period Halfway Point: December 2020
| APRs that count toward the First Half of the Reporting Period |
2016 2017 2018 2019 |
|---|---|
| APRs that count toward the Last Half of the Reporting Period |
2020 2021 2022 2023 |
SMAP Eligibility Methodology ¶
| After 2019 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2023 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
6
San Joaquin County Council of Governments (SJCOG) – includes San Joaquin County; and… ¶
Planning and Projection Periods ¶
5th Cycle Planning Period: 12/31/2015 – 12/31/2023
5th Cycle Projection Period: 01/01/2014 – 12/31/2023
5th Cycle Planning Period Halfway Point: December 2020
| 5th Cycle Planning Period Halfway | Point: De |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2016 2017 2018 2019 |
| APRs that count toward the Last Half of the Reporting Period |
2020 2021 2022 2023 |
SMAP Eligibility Methodology ¶
| After 2019 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2023 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
7
Kings County Association of Governments (KCAG) and Madera County Transportation Commission (MCTC) – includes Kings and Madera; and all cities within each county
Planning and Projection Periods ¶
5th Cycle Planning Period: 01/31/2016 – 01/31/2024
5th Cycle Projection Period: 01/01/2014 – 12/31/2023
5th Cycle Planning Period Halfway Point: January 2020
| 5th Cycle Planning Period Halfway | Point: Ja |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2016 2017 2018 2019 |
| APRs that count toward the Last Half of the Reporting Period |
2020 2021 2022 2023 |
SMAP Eligibility Methodology ¶
| After 2019 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2023 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
8
Merced County Association of Governments (MCAG) – includes Merced County; and all… ¶
Planning and Projection Periods ¶
5th Cycle Planning Period: 03/31/2016 – 03/31/2024
5th Cycle Projection Period: 01/01/2014 – 12/31/2023
5th Cycle Planning Period Halfway Point: March 2020
| 5th Cycle Planning Period Halfway | Point: M |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2016 2017 2018 2019 |
| APRs that count toward the Last Half of the Reporting Period |
2020 2021 2022 2023 |
SMAP Eligibility Methodology ¶
| After 2019 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2023 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
9
City and County of San Francisco ¶
Planning and Projection Periods ¶
6th Cycle Planning Period: 01/31/2023 – 01/31/2031
6th Cycle Projection Period: 06/30/2022 – 12/15/2030
| Planning and Projection Periods 6th Cycle Planning Period: 01/31/2023 – 01/31/2031 6th Cycle Projection Period: 06/30/2022 – 12/15/2030 |
|
|---|---|
| APRs that count toward First Annual Reporting Period | 2023 |
| APRs that count toward Second Annual Reporting Period | 2024 |
| APRs that count toward Third Annual Reporting Period | 2025 |
| APRs that count toward Fourth Annual Reporting Period | 2026 |
| APRs that count toward Fifth Annual Reporting Period | 2027 |
| APRs that count toward Sixth Annual Reporting Period | 2028 |
| APRs that count toward Seventh Annual Reporting Period | 2029 |
| APRs that count toward Eighth Annual Reporting Period | 2030 |
SMAP Eligibility Methodology ¶
| After 2023 APRs are due: |
Less than**1/8ths (12.5%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2024 APRs are due: |
Less than**2/8ths (25%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
| After 2025 APRs are due: |
Less than**3/8ths (37.5%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
10
City and County of San Francisco ¶
SMAP Eligibility Methodology Continued ¶
| After 2026 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2027 APRs are due: |
Less than**5/8ths (62.5%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
| After 2028 APRs are due: |
Less than**6/8ths (75%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
| After 2029 APRs are due: |
Less than**7/8ths (87.5%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
| After 2030 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
11
Association of Bay Area Governments (ABAG), includes Alameda, Contra Costa, Marin, Napa, San Mateo, Santa Clara, Solano, and Sonoma Counties; and all cities within each county
Planning and Projection Periods ¶
5th Cycle Planning Period: 01/31/2015 – 01/31/2023
5th Cycle Projection Period: 01/01/2014 – 10/31/2022
5th Cycle Planning Period Halfway Point: January 2019
| 5th Cycle Planning Period Halfway | Point: Ja |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2015 2016 2017 2018 |
| APRs that count toward the Last Half of the Reporting Period |
2019 2020 2021 2022 |
SMAP Eligibility Methodology ¶
| After 2018 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2022 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
12
Santa Barbara County Association of Governments (SBCAG) – includes Santa Barbara County; and all cities within the County
Planning and Projection Periods ¶
5th Cycle Planning Period: 02/15/2015 – 02/15/2023
5th Cycle Projection Period: 01/01/2014 – 09/30/2022
5th Cycle Planning Period Halfway Point: February 2019
| APRs that count toward the First Half of the Reporting Period |
2015 2016 2017 2018 |
|---|---|
| APRs that count toward the Last Half of the Reporting Period |
2019 2020 2021 2022 |
SMAP Eligibility Methodology ¶
| After 2019 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2023 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 5th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
13
Southern California Association of Governments (SCAG) – includes Imperial, Los Angeles, Orange, Riverside, San Bernardino, and Ventura Counties; and all cities within each county
Planning and Projection Periods ¶
6th Cycle Planning Period: 10/15/2021 – 10/15/2029
6th Cycle Projection Period: 06/30/2021 – 10/15/2029
6th Cycle Planning Period Halfway Point: October 2025
| 6th Cycle Planning Period Halfway | Point: Oc |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2022 2023 2024 2025 |
| APRs that count toward the Last Half of the Reporting Period |
2026 2027 2028 2029 |
SMAP Eligibility Methodology ¶
| After 2025 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2029 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
14
Sacramento Area Council of Governments (SACOG) – includes El Dorado, Placer, Sacramento, Sutter, Yolo, and Yuba Counties; and all cities within each county
Planning and Projection Periods ¶
6th Cycle Planning Period: 5/15/2021 – 5/15/2029
6th Cycle Projection Period: 06/30/2021 – 10/31/2021
6th Cycle Planning Period Halfway Point: October 2024
| 6th Cycle Planning Period Halfway | Point: Oc |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2021 2022 2023 2024 |
| APRs that count toward the Last Half of the Reporting Period |
2025 2026 2027 2028 |
SMAP Eligibility Methodology ¶
| After 2024 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2028 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
15
Tahoe Regional Planning Agency (TRPA) – includes the City of South Lake Tahoe ¶
Planning and Projection Periods ¶
6th Cycle Planning Period: 06/30/2022 – 06/30/2027
6th Cycle Projection Period: 12/15/2021 – 06/30/2027
6th Cycle Planning Period Halfway Point: December 2024
| 6th Cycle Planning Period Halfway | Point: De |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2022 2023 2024 |
| APRs that count toward the Last Half of the Reporting Period |
2025 2026 |
SMAP Eligibility Methodology ¶
| After 2024 APRs are due: |
Less than 3/5ths (60%) permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2026 APRs are due: |
Less than 5/5ths (100%) permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
16
Butte County Association of Governments (BCAG) – includes Butte County; and all cities… ¶
Planning and Projection Periods ¶
6th Cycle Planning Period: 06/15/2022 – 06/15/2030
6th Cycle Projection Period: 12/31/2021 – 06/15/2030
6th Cycle Planning Period Halfway Point: June 2026
| 6th Cycle Planning Period Halfway | Point: Ju |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2022 2023 2024 2025 |
| APRs that count toward the Last Half of the Reporting Period |
2026 2027 2028 2029 |
SMAP Eligibility Methodology ¶
| After 2025 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2029 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
17
County of San Diego; and all cities within the County ¶
Planning and Projection Periods ¶
6th Cycle Planning Period: 04/30/2021 – 04/30/2029
6th Cycle Projection Period: 06/30/2020 – 04/15/2029
6th Cycle Planning Period Halfway Point: April 2024
| APRs that count toward the First Half of the Reporting Period |
2021 2022 2023 2024 |
|---|---|
| APRs that count toward the Last Half of the Reporting Period |
2025 2026 2027 2028 |
SMAP Eligibility Methodology ¶
| After 2024 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2028 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
18
County of Inyo; and all cities within the County ¶
Planning and Projection Periods ¶
6th Cycle Planning Period: 04/30/2021 – 04/30/2029
6th Cycle Projection Period: 12/31/2018 – 04/30/2029
6th Cycle Planning Period Halfway Point: April 2024
| APRs that count toward the First Half of the Reporting Period |
2021 2022 2023 2024 |
|---|---|
| APRs that count toward the Last Half of the Reporting Period |
2025 2026 2027 2028 |
SMAP Eligibility Methodology ¶
| After 2024 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housingneeds assessment cycle for that reporting period.” |
|---|---|
| After 2028 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category qualifies as “fewer units of [an income category of] housing approved than were required for the regional housingneeds assessment cycle for that reporting period.” |
19
Counties of Del Norte, and Siskiyou; and all cities within each county ¶
Planning and Projection Periods ¶
5th Cycle Planning Period: 06/30/2014 – 06/30/2019
5th Cycle Projection Period: 01/01/2014 – 06/30/2019
5th Cycle Planning Period Halfway Point: June 2017
| 5th Cycle Planning Period Halfway | Point: Ju |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2014 2015 2016 |
| APRs that count toward the Last Half of the Reporting Period |
2017 2018 |
SMAP Eligibility Methodology ¶
| After 2016 APRs are due: |
Less than**3/5ths (60%)**permitting progress toward 5thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2018 APRs are due: |
Less than**5/5ths (50%)**permitting progress toward 5thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
20
Counties of Alpine, Lassen, Mariposa, Modoc, Plumas, Sierra, Tehama, Trinity, and Tuolumne; and all cities within each county
Planning and Projection Periods ¶
6th Cycle Planning Period: 08/31/2019 – 06/30/2024
6th Cycle Projection Period: 12/31/2018 – 08/31/2024
6th Cycle Planning Period Halfway Point: August 2022
| 6th Cycle Planning Period Halfway | Point: Au |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2019 2020 2021 |
| APRs that count toward the Last Half of the Reporting Period |
2022 2023 |
SMAP Eligibility Methodology ¶
| After 2021 APRs are due: |
Less than**3/5ths (60%)**permitting progress toward 5thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2023 APRs are due: |
Less than**5/5ths (100%)**permitting progress toward 5thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
21
County of Calaveras; and all cities within the county
Planning and Projection Periods ¶
6th Cycle Planning Period: 06/15/2019 – 06/15/2027
6th Cycle Projection Period: 12/31/2018 – 06/15/2027
6th Cycle Planning Period Halfway Point: June 2023
| 6th Cycle Planning Period Halfway | Point: Ju |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2019 2020 2021 2022 |
| APRs that count toward the Last Half of the Reporting Period |
2023 2024 2025 2026 |
SMAP Eligibility Methodology ¶
| After 2022 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2026 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
22
County of Humboldt; and all cities within the county
Planning and Projection Periods ¶
6th Cycle Planning Period: 08/31/2019 – 08/31/2027
6th Cycle Projection Period: 12/31/2018 – 08/31/2027
6th Cycle Planning Period Halfway Point: August 2024
| 6th Cycle Planning Period Halfway | Point: Au |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2020 2021 2022 2023 |
| APRs that count toward the Last Half of the Reporting Period |
2024 2025 2026 2027 |
SMAP Eligibility Methodology ¶
| After 2023 APRs are due: |
Less than 4/8ths (50%) permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2027 APRs are due: |
Less than 8/8ths (100%) permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
23
Counties of Lake, Mendocino, Mono, and Nevada; and all cities within the county
Planning and Projection Periods ¶
6th Cycle Planning Period: 08/15/2019 – 08/15/2027
6th Cycle Projection Period: 12/31/2018 – 08/15/2027
6th Cycle Planning Period Halfway Point: August 2024
| 6th Cycle Planning Period Halfway | Point: Au |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2020 2021 2022 2023 |
| APRs that count toward the Last Half of the Reporting Period |
2024 2025 2026 2027 |
SMAP Eligibility Methodology ¶
| After 2023 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2027 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
24
County of Shasta; and all cities within the county ¶
Planning and Projection Periods ¶
6th Cycle Planning Period: 04/15/2020 – 04/15/2028
6th Cycle Projection Period: 12/31/2018 – 06/15/2027
6th Cycle Planning Period Halfway Point: April 2024
| 6th Cycle Planning Period Halfway | Point: Ap |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2020 2021 2022 2023 |
| APRs that count toward the Last Half of the Reporting Period |
2024 2025 2026 2027 |
SMAP Eligibility Methodology ¶
| After 2023 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2027 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
25
Counties of San Luis Obispo and Colusa; and all cities within each county
Planning and Projection Periods ¶
6th Cycle Planning Period: 12/31/2020 – 12/31/2028
6th Cycle Projection Period: 12/31/2018 – 12/31/2028
6th Cycle Planning Period Halfway Point: July 2024
| 6th Cycle Planning Period Halfway | Point: Ju |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2021 2022 2023 2024 |
| APRs that count toward the Last Half of the Reporting Period |
2025 2026 2027 2028 |
SMAP Eligibility Methodology ¶
| After 2024 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2028 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
26
County of Glenn; and all cities within the county ¶
Planning and Projection Periods ¶
6th Cycle Planning Period: 11/30/2021 – 11/30/2029
6th Cycle Projection Period: 12/31/2018 – 11/30/2029
6th Cycle Planning Period Halfway Point: November 2025
| 6th Cycle Planning Period Halfway | Point: No |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2022 2023 2024 2025 |
| APRs that count toward the Last Half of the Reporting Period |
2026 2027 2028 2029 |
SMAP Eligibility Methodology ¶
| After 2025 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2029 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6thCycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
27
County of Amador; and all cities within the county ¶
Planning and Projection Periods ¶
6th Cycle Planning Period: 09/15/2021 – 09/15/2029
6th Cycle Projection Period: 12/31/2018 – 09/15/2029
6th Cycle Planning Period Halfway Point: September 2025
| 6th Cycle Planning Period Halfway | Point: Se |
|---|---|
| APRs that count toward the First Half of the Reporting Period |
2022 2023 2024 2025 |
| APRs that count toward the Last Half of the Reporting Period |
2026 2027 2028 2029 |
SMAP Eligibility Methodology ¶
| After 2025 APRs are due: |
Less than**4/8ths (50%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
|---|---|
| After 2029 APRs are due: |
Less than**8/8ths (100%)**permitting progress toward 6th Cycle regional housing needs assessment for an income category, qualifies as “fewer units of [an income category of] housing approved than were required for the regional housing needs assessment cycle for that reporting period.” |
28