Title 12 — STREETS, SIDEWALKS AND PUBLIC PROPERTY›Chapter 12.08 — STREETS AND SIDEWALKS
Article I
Buena Park Municipal Code · 2026-07 edition · updated 2026-10-01 · Buena Park
§ 12.08.010. Construction requirements and specifications.¶
§ 12.08.020. Prerequisite to utility connections and certificate of occupancy.¶
§ 12.08.030. Waiver of construction authorized when.¶
§ 12.08.040. Definitions.¶
§ 12.08.050. Refilling or removal of obstruction required.¶
§ 12.08.060. Resurfacing—Requirements.¶
§ 12.08.065. Street cut moratorium.¶
§ 12.08.070. Resurfacing—Work performed by city when.¶
§ 12.08.080. Resurfacing—Costs of city work paid by permit holder.¶
§ 12.08.090. Computation of excavation costs.¶
§ 12.08.100. Resurfacing—Responsibility for future repairs.¶
§ 12.08.110. Traffic disturbance limitations.¶
§ 12.08.120. Pipe and conduit placement.¶
§ 12.08.130. Backfilling regulations—Dust nuisance prevention.¶
§ 12.08.140. Barricades and safety precautions required.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code