Title 13 — PUBLIC SERVICES›Chapter 13.04 — SEWER SERVICE SYSTEM

Amador City Municipal Code Art. 6 Public Sewer Construction

Amador City Municipal Code · 2026-10 edition · updated 2026-10-04 · Amador City

Cite as: Amador City Municipal Code Article 6 · Text as of 2026-10-04

13.04.330 - Permit required.

In accordance with Article 8 of this chapter, no person shall construct, extend or connect to any public sewer without first obtaining a written permit from the city and paying all fees and connection charges and furnishing bonds as required therein. The provisions of this section requiring permits shall not be construed to apply to contractors constructing sewers and appurtenances under contracts awarded and entered into by the city.

(Ord. 147 § 6.01, 2002)

Exceptions & meaning →

13.04.340 - Plans, profiles and specifications required.

The application for a permit for public sewer construction shall be accompanied by complete plans, profiles, and specifications, complying with all applicable ordinances, rules and regulations of city prepared by a registered civil engineer showing all details of the proposed work based on an accurate survey of the ground. The application, together with the plans, profiles and specifications shall be examined by the manager who shall within ten (10) days approve them as filed or require them to be modified as he or she deems necessary for proper installation. After examination on behalf of the city, the application, plans, profiles and specifications shall be submitted to the council at its next regular meeting for its consideration. When the council is satisfied that the proposed work is proper and the plans, profiles and specifications are sufficient and correct, it shall order the issuance of a permit predicated upon the payment of all connection charges, fees and furnishing bonds as required by the city. The permit shall prescribe such terms and conditions as the council finds necessary in the public interest.

(Ord. 147 § 6.02, 2002)

Exceptions & meaning →

13.04.350 - Subdivisions.

For purposes or this chapter, a subdivision shall be defined as improved or unimproved land or lands divided for the purpose of sale or lease, whether immediate or future, into two or more lots or parcels.

The requirements of Sections 13.04.330, 13.04.340 and 13.04.430 shall be fully complied with and all fees and connection charges required under Article 8, excepting connection permit and inspection fees required under Section 13.04.700 shall be paid before any final subdivision map shall be approved by the city and before any permit to install sewerage facilities to serve the subdivision is issued. The final subdivision map shall provide for the dedication for public use of all streets, easements or rights-of-way in which public sewers are to be constructed.

(Ord. 147 § 6.03, 2002)

Exceptions & meaning →

13.04.360 - Easements of rights-of-way.

In the event that an easement is required for the extension of the public sewer or the making of connections, the applicant shall procure and have accepted by the council a proper easement or grant of right-of-way sufficient in law to allow the laying and maintenance of such extension or connection.

(Ord. 147 § 6.04, 2002)

Exceptions & meaning →

13.04.370 - Persons authorized to perform work.

Only properly licensed contractors shall be authorized to perform the work of public sewer construction within the city. All terms and conditions of the permit issued by the city to the applicant shall be binding on the contractor.

(Ord. 147 § 6.05, 2002)

Exceptions & meaning →

13.04.380 - Grade stakes.

Grade and line stakes shall be set by a registered civil engineer prior to the start of work on any public sewer construction. The contractor shall be responsible for accurately transferring grades to grade bars and sewer invert.

(Ord. 147 § 6.06, 2002)

Exceptions & meaning →

13.04.390 - Compliance with regulations.

Any person constructing a sewer within a street shall comply with all state, county, or city laws, ordinances, rules and regulations pertaining to the cutting of pavement, opening, barricading, lighting and protection of trenches, back filling and repaving thereof and shall obtain all permits and pay all fees required by the department having jurisdiction prior to the issuance of a permit by the city. Any person requesting a permit shall also comply with all applicable guidelines, including the local guidelines of city, adopted pursuant to the Environmental Quality Act of 1970, and shall make all deposits required and pay all fees which may be established by the city to process applications to comply with the act.

(Ord. 147 § 6.07, 2002)

Exceptions & meaning →

13.04.400 - Protection of excavation.

The applicant shall maintain such barriers, lights and signs as are necessary to give warning to the public at all times that a sewer is under construction and of each dangerous condition to be encountered as a result thereof. He or she shall also likewise protect the public in the use of the sidewalk against any such conditions in connection with the construction of the sewer. Streets, sidewalks, parkways and other property disturbed in the course of the work shall be reinstalled in a manner satisfactory to the city and the county or any other person having jurisdiction thereover.

(Ord. 147 § 6.08, 2002)

Exceptions & meaning →

13.04.410 - Design and construction standards.

Minimum standards for the design and construction of sewers within the city shall be in accordance with the specifications for sewer construction heretofore or hereafter adopted by the city, copies of which are on file in the city office. The city may permit modifications or may require higher standards where unusual conditions are encountered. "As built" drawings showing the actual location of all mains, structures, Y's, laterals and clean out shall be filed with the city before final acceptance of the work.

(Ord. 147 § 6.09, 2002)

Exceptions & meaning →

13.04.420 - Completion of sewer required.

Before any acceptance of any sewer line by the city and prior to the admission of any sewage into the system, the sewer line shall be tested and shall be complete in full compliance with all requirements of the specifications for sewer construction and to the satisfaction of the city engineer. If the work of constructing public sewerage facilities is not completed within the time limit specified in the permit, the council may extend the time limit or may complete the work an take appropriate steps to enforce the provisions of the improvement security furnished by the permittee pursuant to Section 13.04.430 of this chapter.

(Ord. 147 § 6.10, 2002)

Exceptions & meaning →

13.04.430 - Improvement security.

Prior to issuance of a permit for public sewer construction, the applicant shall furnish to the city a faithful performance bond, cash, or other improvement security acceptable to the council, in the amount of the total estimated cost of the work as determined by the city engineer. Such faithful performance bond, cash deposit, or other improvement security shall be conditioned upon the performance of the terms and considerations of the permit and, unless more stringent requirements are otherwise specified by the council, shall guarantee the correction of faulty workmanship and replacement of defective materials for a period of one year from and after the date of acceptance of the work by the council. The applicant shall also furnish to the city a labor and material bond, or other security acceptable to the council, in the amount of the total estimated cost of the work.

(Ord. 147 § 6.11, 2002)

Exceptions & meaning →

13.04.440 - Financing—General.

Except as hereinafter provided in Sections 13.04.450 through 13.04.490, the extension of the public sewerage facilities to serve any parcel or tract of land shall be done by and at the expense of the owner, although the city reserves the right to perform the work and bill the owner for the cost thereof, to perform the work itself, or to perform the work pursuant to special assessment proceedings. The size of all sewer mains and other sewer facilities shall be as required by the city.

(Ord. 147 § 6.12, 2002)

Exceptions & meaning →

13.04.450 - Partial reimbursement for off-site sewers.

Whenever a public sewer is required to be extended more than two hundred (200) feet from the existing public sewerage facilities of the city to the nearest corner or point on the property line of the installer and the city finds that the sewer will potentially serve property other than that of the installer, the installer shall be entitled to an off site sewer reimbursement credit in an amount determined by the council based upon the estimated number of side sewer connections which may, in the future, be made by other property owners to the sewer paid for by the installer beyond the limits of his or her property.

Any person proposing to construct an off site sewer as herein defined, shall submit a written request for a reimbursement agreement to the city manager no less than two weeks prior to the date of the council meeting at which council action is desired. If the manager finds that the sewer to be constructed may reasonably be expected to benefit properties owned by persons other than the installer, he or she shall cause a reimbursement agreement to be prepared and submitted to the council for approval, which agreement shall provide for partial reimbursement for off site sewer construction through payment to the installer of an amount equal to eighty-five (85) percent of the collector sewer charges paid to the city pursuant to Section 13.04.710(A) by others making side sewer connections to the off site sewer beyond the limits of the installer's property within ten (10) years from the date of acceptance of the sewer by the city. The total amount of the partial reimbursement shall not exceed the installer's entitlement to off site sewer reimbursement credit as determined above. Payments by the city to the installer will be made in July of each year. The agreement shall be made and entered into prior to the issuance of a permit to the work by the city.

(Ord. 147 § 6.13, 2002)

Exceptions & meaning →

13.04.460 - Partial reimbursement for oversize sewers.

Whenever a public sewer larger than eight inches in diameter is required to be installed, and the city finds that the sewer will potentially serve property other than that of the installer, the installer shall be entitled to an oversize sewer reimbursement credit determined by the city to the difference between the estimated cost of installing the size of the line required to serve the installer's needs (eight-inch minimum) and the estimated cost of installing the lager size line. In the event that all or part of the oversize sewer to be constructed is an off site sewer, the installer's credit for oversize sewer reimbursement shall be in addition to an off site sewer reimbursement credit for which he or she is eligible under Section 13.04.450.

Any person proposing to construct an oversize sewer, as herein defined, shall submit a written request for a reimbursement agreement to the city manager no less than two weeks prior to the date of the council meeting at which council action is desired. If the manager finds that the sewer to be constructed may reasonably be expected to benefit properties owned by persons other than the installer, he or she shall cause a reimbursement agreement to be prepared and submitted to the council for approval, which agreement shall provide for partial reimbursement for oversize sewer construction though annual payments to the installer from the oversize sewer reimbursement fund of the city. Payments by the city to the installer will be made in July of each year following the first full year after acceptance of the oversize sewer by the city. The amount of each of the payments shall be equal to that potion of the total trunk sewer charges deposited in the oversize sewer reimbursement fund of the city pursuant to Section 13.04.710 during the previous twelve (12) month period as the installer's over size sewer reimbursement credit bears to the total of all unexpired oversize sewer reimbursement entitlement. The agreement shall be entered into prior to the issuance of a permit for the work by the city and shall terminate upon payment by the city of the full amount of the installer's oversize sewer reimbursement credit, or after the expiration of ten (10) years from the date of acceptance of the oversize sewer by the city.

(Ord. 147 § 6.14, 2002)

Exceptions & meaning →

13.04.470 - Partial reimbursement for pumping stations or treatment facilities.

When ever sewage pumping facilities or sewage treatment facilities are required to be constructed by a developer, and the city finds that the facilities will potentially serve property other than that of the installer, the installer shall be entitled to a facilities reimbursement credit determine by the city equal to the difference between the estimated cost of the size of facilities required to serve the installer's needs and the estimated cost of installing the larger facilities.

Any person proposing to construct sewage pumping or treatment facilities shall submit a written request for a reimbursement agreement to the city manager no less than two weeks prior to the date of the council meeting at which council action is desired. If the manager finds that the sewerage facilities to be constructed may reasonably be expected to benefit properties owned by persons other than the installer, he or she shall conduct a special study of the proposed project and the service area involved and shall cause a reimbursement agreement to be prepared and submitted to the council for approval, together with recommendations concerning the establishment of an appropriate special benefit zone and special equalization charge pursuant to Section 13.04.680. The reimbursement agreement shall provide for partial reimbursement through payment to the installer of all or part of such special equalization charges as may be collected from other properties connecting directly to or indirectly to the sewage pumping or treatment facilities to be constructed. Payments by the city to the installer will be made in July of each year. The agreement shall be entered into prior to the issuance of a permit for the work by the /city and shall terminate upon payment by the city of the full amount of the installer's facilities reimbursement credit, or after the expiration of ten (10) years from the date of acceptance of the facilities by the city.

(Ord. 147 § 6.15, 2002)

Exceptions & meaning →

13.04.480 - Special reimbursement agreements.

Where special conditions exist in the opinion of the city, relating to any reimbursement agreement pursuant to the provisions of this article, the council may, either in addition to or in lieu of any of the provisions of this article, authorize a special reimbursement contract between the city and the person or persons constructing public sewerage facilities. The special reimbursement agreement shall be made and entered into prior to the issuance of a permit for the work by the city.

(Ord. 147 § 6.16, 2002)

Exceptions & meaning →

13.04.490 - City participation.

The city may, at its discretion, pay that portion of the costs of extending its trunk sewer system or constructing sewage pumping or treatment facilities equal to the difference in cost between the size of facility required by installer's development and the size of facility that the city requires under it long range master plan when all of the following conditions are present:

A. The facility to be constructed replaces presently inadequate facility;

B. The facility to be constructed is one of those described in the master plan heretofore or hereafter adopted by the council, and is part of a currently planned capital improvement program of the city, and

C. The council has determined that it is within the city's financial ability to finance its share of the improvement.

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code