Chapter 7 — DESIGN REVIEWArticle I — GENERAL PROVISIONS

§ 7.6 DISTRICTS OF JURISDICTION.

Red Bluff Planning Code · edición 2026-07 · actualizado 2026-07-09 · Red Bluff

Esta sección aún no está traducida y se muestra en inglés.

(A) All projects within the city which require a permit from the Building Department must conform to the standards in this chapter, except as noted otherwise in this section.

(B) Review by the Technical Advisory Committee or Design Review Subcommittee of the Technical Advisory Committee, is required for all projects which require a building, sign, demolition or grading permit from the city, except as noted otherwise in this section.

(C) Unless specifically required by the Technical Advisory Committee or the Design Review Subcommittee of the Technical Advisory Committee, design review is not required for the following projects:

  • (1) Reroofing;

  • (2) New detached single-family dwelling;

  • (3) Mobile home installations, except as noted in § 7.9;

  • (4) Signs exempted herein, except painted signs described herein; and

  • (5) Interior alterations and construction.

(D) The Technical Advisory Committee or the design review subcommittee of the Technical Advisory Committee shall also review all city-financed projects including, but not limited to municipal buildings, parks and open spaces and street furniture.

(`61 Code, § 7.6) (Ord. 658, passed 12-2-1980; Am. Ord. 706, passed 12-21-1982; Am. Ord. 768, passed 9-2-1986; Am. Ord. 846, passed 8-4-1992)

GoCodebook ofrece acceso público limitado, búsqueda, citas, explicación multilingüe e interpretación práctica de normas de construcción legalmente adoptadas. No sustituye a las publicaciones oficiales del ICC ni de los códigos de California.