California ADU rules · Tehama County

Can I Build an ADU in Red Bluff?

Yes — you can build an ADU in Red Bluff. California's statewide ADU law requires every city, including Red Bluff, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Red Bluff's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

CA state law

1 ADU + 1 JADU

At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Units on a multifamily lot

Local rule

conversions (>=1 or 25% of units) + up to 2 detached

Red Bluff allows only up to 2 detached ADUs per multifamily lot, not 4 or 8 as in state law.

§ 25.197

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

Local rule

1,200 sq ft

Local cap is 1,200 sq ft for detached ADUs.

§ 25.197(B)(1)

Max attached ADU size

Local rule

50% of primary (>1,600 sq ft); 800 sq ft max if ≤1,600 sq ft; absolute max 1,200 sq ft

Attached ADUs are capped at 50% of primary if >1,600 sq ft, otherwise 800 sq ft; never more than 1,200 sq ft.

§ 25.197(B)(1)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

Local rule

16 ft

No local transit/2-story exception; follows state for those cases.

§ 25.197(20)

Setbacks

Side setback

Local rule

4 ft

4 ft minimum for new construction; conversions of existing structures may have zero setback.

§ 25.197(8)

Rear setback

Local rule

4 ft

4 ft minimum for new construction; conversions of existing structures may have zero setback.

§ 25.197(8)

Front setback

CA state law

No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Separation from main house

CA state law

None required

No statewide separation requirement between the ADU and the primary dwelling.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Parking

Parking required

Local rule

Up to 1 space

1 space per unit or per bedroom (whichever is less); state exemptions apply.

§ 25.197(11), (12)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

Local rule

Not required

No replacement parking required for garage conversions.

§ 25.197(13)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Only for a JADU

No owner-occupancy for ADUs through 12/31/2024; JADUs require owner occupancy.

§ 25.197(5)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

Local rule

Building permit, Demolition permit (for garage conversion)

Demolition permit for garage conversion is issued concurrently with building permit.

§ 25.197(16), (18)

Red Bluff-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Fire protection requirements

Sprinklers not required unless primary dwelling requires them; Fire Marshal may require additional fire protection for units not meeting setbacks.

Red Bluff limits detached ADUs on multifamily lots to 2 per lot and sets a 1,200 sq ft cap for all ADUs. Owner-occupancy is required only for JADUs, and fire protection may be required if setbacks are not met.

Frequently asked questions

Can I build an ADU in Red Bluff?

Yes. California's statewide ADU law requires Red Bluff to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Red Bluff?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Red Bluff?

Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.

Is parking required for an ADU in Red Bluff?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Red Bluff?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Red Bluff?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Red Bluff Municipal Code § 25.197, § 25.239; Ord. 1060 (8-17-2021)
  • § 25.197
  • § 25.197(B)(1)
  • § 25.197(20)
  • § 25.197(8)
  • § 25.197(11), (12)
  • § 25.197(13)
  • § 25.197(5)
  • § 25.197(16), (18)
  • § 25.197(14)
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Red Bluff's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Red Bluff Planning before relying on it.

Will an ADU work on your Red Bluff lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related