California ADU rules · Santa Barbara County

Can I Build an ADU in Buellton?

Yes — you can build an ADU in Buellton. California's statewide ADU law requires every city, including Buellton, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Buellton's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

Local rule

1 detached ADU + 1 attached ADU + 1 JADU (all three may be combined; if combined, detached ADU max height is 18 ft)

Allows both attached and detached ADU plus JADU on a single-family lot if combined.

§19.06.190(D)(3)

Units on a multifamily lot

Local rule

Conversions: at least 1 or up to 25% of existing units; up to 8 detached ADUs (not to exceed number of existing units); up to 2 detached ADUs on a lot with a proposed multifamily dwelling

Specifies detached ADU cap and rules for proposed multifamily dwellings.

§19.06.190(D)(3)

Junior ADU (JADU)

Local rule

Allowed

JADUs allowed only on single-family lots.

§19.06.190(D)(2)(d), (D)(3)(a)(i)

Size & height

Max detached ADU size

Local rule

1,200 sq ft

Local maximum matches state cap.

§19.06.190(D)(2)(a)

Max attached ADU size

Local rule

850 sq ft for 1-bedroom or less; 1,000 sq ft for 2+ bedrooms

Local rule sets specific attached ADU size caps.

§19.06.190(D)(2)(b)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

Local rule

25 ft

25 ft standard; 18 ft detached if combined with JADU/attached ADU.

§19.06.190(D)(2)(e), (D)(3)(a)(iii)

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

Local rule

Underlying zone’s front setback applies, except must allow an ADU up to 800 sq ft and 16 ft tall in the front yard if it cannot fit elsewhere

Front setback cannot preclude a minimum ADU if no other feasible location.

§19.06.190(D)(4)

Separation from main house

Local rule

None required

Must comply with general building separation for the zone; no ADU-specific rule.

§19.06.190(D)(4)(c)

Parking

Parking required

Local rule

Up to 1 space

Max 1 space per unit or bedroom, whichever is less; tandem allowed.

§19.06.190(D)(8)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

Local rule

Not required

No replacement parking required for garage conversions.

§19.06.190(D)(8)(b)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Only for a JADU

Owner occupancy required for JADUs only.

§19.06.190(G), (C)(c)

Impact-fee waiver

Local rule

Waived under 750 sq ft

No development impact fees for ADUs under 750 sq ft.

§19.06.190(F)(1)(a)

Permits required

Local rule

Building permit, Ministerial planning review

Both building permit and ministerial planning review required.

§19.06.190(F)(1)(b), (G)

Buellton-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Historic Districts

No ADU parking required in historic districts.

Native Tree Protection

No removal of protected native trees unless compliant with Ch. 12.32.

Buellton allows both attached and detached ADUs plus a JADU on single-family lots, with a 25 ft height limit (18 ft if all three are combined). Local rules specify attached ADU size caps and require no replacement parking for garage conversions.

Frequently asked questions

Can I build an ADU in Buellton?

Yes. California's statewide ADU law requires Buellton to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Buellton?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Buellton?

Side and rear setbacks are limited to 4 ft. Underlying zone’s front setback applies, except must allow an ADU up to 800 sq ft and 16 ft tall in the front yard if it cannot fit elsewhere.

Is parking required for an ADU in Buellton?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Buellton?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Buellton?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Buellton Zoning Code §19.06.190 et seq., amended 5/22/2025
  • §19.06.190(D)(3)
  • §19.06.190(D)(2)(d), (D)(3)(a)(i)
  • §19.06.190(D)(2)(a)
  • §19.06.190(D)(2)(b)
  • §19.06.190(D)(2)(e), (D)(3)(a)(iii)
  • §19.06.190(D)(4)
  • §19.06.190(D)(4)(c)
  • §19.06.190(D)(8)
  • §19.06.190(D)(8)(b)
  • §19.06.190(G), (C)(c)
  • §19.06.190(F)(1)(a)
  • §19.06.190(F)(1)(b), (G)
  • §19.06.190(D)(7)
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Last updated 2026-06-25. This is an AI-assisted summary of Buellton's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Buellton Planning before relying on it.

Will an ADU work on your Buellton lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related