California ADU rules · Orange County

Can I Build an ADU in Anaheim?

Yes — you can build an ADU in Anaheim. California's statewide ADU law requires every city, including Anaheim, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Anaheim's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

Local rule

1 conversion/inside-space ADU + 1 new detached ADU + 1 JADU (max 4 units/lot incl. primary)

Anaheim allows one ADU in existing/proposed single-family or accessory space, one new-construction ADU, and one JADU — but caps the total dwelling units on a single-family-zoned lot at four, including the primary dwelling.

AMC § 18.38.015, Table 38-A

Units on a multifamily lot

CA state law

Conversion ADUs (≥1, up to 25% of units) + up to 8 detached

Conversions of non-livable space (at least 1, or up to 25% of existing units) plus up to 8 detached ADUs on a lot with existing multifamily — never exceeding the number of existing units. JADUs are single-family only.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Junior ADU (JADU)

Local rule

Allowed

Up to 500 sq ft. Anaheim allows a JADU within the existing single-family home OR attached to a newly constructed detached ADU — not only inside the existing home.

AMC § 18.38.015

Size & height

Max detached ADU size

Local rule

1,200 sq ft

Anaheim allows a detached ADU above the 800 sq ft state floor up to 1,200 sq ft (Table 38-A, subject to AMC § 18.04.080.020). 800 sq ft is the state-protected by-right floor, NOT Anaheim's detached-ADU maximum.

AMC § 18.38.015, Table 38-A (subject to § 18.04.080.020)

Max attached ADU size

CA state law

50% of the primary dwelling, but ≥850 sq ft (≥1,000 sq ft for 2+ bedrooms) is always allowed

Cal. Gov. Code § 66321 (size minimums & height)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

Local rule

18 ft

18 ft plus 2 ft for roof pitch for a detached ADU, or the height of the main dwelling, whichever is greater; attached ADUs follow the underlying zone. Transit corridors get the state 20-ft allowance.

AMC § 18.38.015, Table 38-A

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

Local rule

Detached ADU may be no closer to the front line than the front-most wall of the main dwelling; garage/carport conversions may sit in the front setback, and the Planning Director may reduce the front setback where needed to fit an 800 sq ft ADU

AMC § 18.38.015, Table 38-A

Separation from main house

Local rule

10 ft

The 10-ft separation between a detached ADU and the main dwelling applies to ADUs OVER 800 sq ft (Table 38-A). The 800 sq ft by-right ADU and conversions of legally established structures are exempt from building-separation requirements. State law sets no separation.

AMC § 18.38.015, Table 38-A

Parking

Parking required

Local rule

Up to 1 space

Anaheim requires 0 spaces for a studio ADU and 1 space for an ADU with one or more bedrooms, subject to the state exemptions (½-mi of transit, within an existing structure, historic district, etc.). No parking is required for a JADU.

AMC § 18.38.015 (parking)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

CA state law

Not required

When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.

Cal. Gov. Code § 66314 (local ordinance standards)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Only for a JADU

No owner-occupancy for ADUs. Owner-occupancy is required for a JADU that shares sanitation facilities with the primary residence; Anaheim's checklist still routes applicants through a JADU owner-occupancy covenant, so confirm directly with Planning for a JADU with its own bathroom.

AMC § 18.38.015.110 (§ 18.38.015.1101)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

CA state law

Building permit

Only a ministerial building permit — no conditional use permit or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Anaheim-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Sewer-capacity verification

ADUs/JADUs are prohibited where City Council has identified insufficient sewer infrastructure (public health/safety). The city checklist requires written sewer-capacity verification before building plan check.

SB 9 lot split + two-unit development

No ADU or JADU is allowed on a parcel that has obtained permits for BOTH a Two-Unit Development and an Urban Lot Split (SB 9).

Historic properties

An ADU or JADU on a historic property must comply with the City's Architectural Style Guide and Citywide Historic Preservation Plan design standards.

Anaheim's ADU/JADU standards live in AMC § 18.38.015 (Table 38-A). Detached ADUs can reach 1,200 sq ft — not merely the 800 sq ft state floor — and a single-family lot is capped at four total dwelling units (primary + ADUs + one JADU). Distinctive local rules: a 10-ft separation for detached ADUs over 800 sq ft, written sewer-capacity verification before plan check, and a bar on ADUs where an SB 9 lot split plus two-unit development were already permitted. Verify sewer capacity, SB 9 status, historic status, and JADU covenant requirements with Anaheim Planning.

Frequently asked questions

Can I build an ADU in Anaheim?

Yes. California's statewide ADU law requires Anaheim to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Anaheim?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Anaheim?

Side and rear setbacks are limited to 4 ft. Detached ADU may be no closer to the front line than the front-most wall of the main dwelling; garage/carport conversions may sit in the front setback, and the Planning Director may reduce the front setback where needed to fit an 800 sq ft ADU.

Is parking required for an ADU in Anaheim?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Anaheim?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Anaheim?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Anaheim Mun. Code § 18.38.015 (Ord. 6620)
  • AMC § 18.38.015, Table 38-A
  • AMC § 18.38.015
  • AMC § 18.38.015, Table 38-A (subject to § 18.04.080.020)
  • AMC § 18.38.015 (parking)
  • AMC § 18.38.015.110 (§ 18.38.015.1101)
  • AMC § 18.38.015.0501
  • Anaheim Mun. Code § 18.38.255
  • AMC § 18.38.015.090
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66314 (local ordinance standards)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Anaheim's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Anaheim Planning before relying on it.

Will an ADU work on your Anaheim lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related