California ADU rules · Orange County
Can I Build an ADU in Anaheim?
Yes — you can build an ADU in Anaheim. California's statewide ADU law requires every city, including Anaheim, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.
Can you build one?
ADUs allowed
CA state lawYes — by right
ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.
Units on a single-family lot
Local rule1 conversion/inside-space ADU + 1 new detached ADU + 1 JADU (max 4 units/lot incl. primary)
Anaheim allows one ADU in existing/proposed single-family or accessory space, one new-construction ADU, and one JADU — but caps the total dwelling units on a single-family-zoned lot at four, including the primary dwelling.
Units on a multifamily lot
CA state lawConversion ADUs (≥1, up to 25% of units) + up to 8 detached
Conversions of non-livable space (at least 1, or up to 25% of existing units) plus up to 8 detached ADUs on a lot with existing multifamily — never exceeding the number of existing units. JADUs are single-family only.
Junior ADU (JADU)
Local ruleAllowed
Up to 500 sq ft. Anaheim allows a JADU within the existing single-family home OR attached to a newly constructed detached ADU — not only inside the existing home.
Size & height
Max detached ADU size
Local rule1,200 sq ft
Anaheim allows a detached ADU above the 800 sq ft state floor up to 1,200 sq ft (Table 38-A, subject to AMC § 18.04.080.020). 800 sq ft is the state-protected by-right floor, NOT Anaheim's detached-ADU maximum.
Max attached ADU size
CA state law50% of the primary dwelling, but ≥850 sq ft (≥1,000 sq ft for 2+ bedrooms) is always allowed
Guaranteed minimum size
CA state law800 sq ft
An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).
Max JADU size
CA state law500 sq ft
Max height
Local rule18 ft
18 ft plus 2 ft for roof pitch for a detached ADU, or the height of the main dwelling, whichever is greater; attached ADUs follow the underlying zone. Transit corridors get the state 20-ft allowance.
Setbacks
Side setback
CA state law4 ft
A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.
Rear setback
CA state law4 ft
Front setback
Local ruleDetached ADU may be no closer to the front line than the front-most wall of the main dwelling; garage/carport conversions may sit in the front setback, and the Planning Director may reduce the front setback where needed to fit an 800 sq ft ADU
Separation from main house
Local rule10 ft
The 10-ft separation between a detached ADU and the main dwelling applies to ADUs OVER 800 sq ft (Table 38-A). The 800 sq ft by-right ADU and conversions of legally established structures are exempt from building-separation requirements. State law sets no separation.
Parking
Parking required
Local ruleUp to 1 space
Anaheim requires 0 spaces for a studio ADU and 1 space for an ADU with one or more bedrooms, subject to the state exemptions (½-mi of transit, within an existing structure, historic district, etc.). No parking is required for a JADU.
Transit parking exemption
CA state lawYes — no parking required near transit & for conversions
No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.
Garage-conversion replacement parking
CA state lawNot required
When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.
Approval, timeline & cost
Approval path
CA state lawMinisterial (by right)
No public hearing or discretionary design review for a qualifying ADU.
Approval timeline
CA state law60 days
The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.
Owner-occupancy
Local ruleOnly for a JADU
No owner-occupancy for ADUs. Owner-occupancy is required for a JADU that shares sanitation facilities with the primary residence; Anaheim's checklist still routes applicants through a JADU owner-occupancy covenant, so confirm directly with Planning for a JADU with its own bathroom.
Impact-fee waiver
CA state lawWaived under 750 sq ft
An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.
Permits required
CA state lawBuilding permit
Only a ministerial building permit — no conditional use permit or discretionary design review for a qualifying ADU.
Anaheim-specific factors that can change the answer
State law sets the floor, but these local conditions often decide whether a specific parcel works.
Sewer-capacity verification
ADUs/JADUs are prohibited where City Council has identified insufficient sewer infrastructure (public health/safety). The city checklist requires written sewer-capacity verification before building plan check.
SB 9 lot split + two-unit development
No ADU or JADU is allowed on a parcel that has obtained permits for BOTH a Two-Unit Development and an Urban Lot Split (SB 9).
Historic properties
An ADU or JADU on a historic property must comply with the City's Architectural Style Guide and Citywide Historic Preservation Plan design standards.
Anaheim's ADU/JADU standards live in AMC § 18.38.015 (Table 38-A). Detached ADUs can reach 1,200 sq ft — not merely the 800 sq ft state floor — and a single-family lot is capped at four total dwelling units (primary + ADUs + one JADU). Distinctive local rules: a 10-ft separation for detached ADUs over 800 sq ft, written sewer-capacity verification before plan check, and a bar on ADUs where an SB 9 lot split plus two-unit development were already permitted. Verify sewer capacity, SB 9 status, historic status, and JADU covenant requirements with Anaheim Planning.
Frequently asked questions
Can I build an ADU in Anaheim?
Yes. California's statewide ADU law requires Anaheim to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.
How big can an ADU be in Anaheim?
A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.
What are the setback requirements for an ADU in Anaheim?
Side and rear setbacks are limited to 4 ft. Detached ADU may be no closer to the front line than the front-most wall of the main dwelling; garage/carport conversions may sit in the front setback, and the Planning Director may reduce the front setback where needed to fit an 800 sq ft ADU.
Is parking required for an ADU in Anaheim?
Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.
How long does ADU approval take in Anaheim?
A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.
Do I have to live on the property to build an ADU in Anaheim?
Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.
Sources
- Anaheim Mun. Code § 18.38.015 (Ord. 6620)
- AMC § 18.38.015, Table 38-A
- AMC § 18.38.015
- AMC § 18.38.015, Table 38-A (subject to § 18.04.080.020)
- AMC § 18.38.015 (parking)
- AMC § 18.38.015.110 (§ 18.38.015.1101)
- AMC § 18.38.015.0501
- Anaheim Mun. Code § 18.38.255
- AMC § 18.38.015.090
- Cal. Gov. Code §§ 66310–66342 (ADU Law)
- HCD 2025 Accessory Dwelling Unit Handbook
- Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
- Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
- Cal. Gov. Code § 66321 (size minimums & height)
- Cal. Gov. Code § 66333 (junior ADUs)
- Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
- Cal. Gov. Code § 66314 (local ordinance standards)
- Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)
Last updated 2026-06-25. This is an AI-assisted summary of Anaheim's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Anaheim Planning before relying on it.
Will an ADU work on your Anaheim lot?
Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.
Check my parcel free